What is the construction process of foundation drilling?
With the development of the times, more and more people have realized the importance of owning a house of their own. Many rural people will choose to build their own houses. So what is the construction process of foundation drilling?
What is the construction process of rotary piles?
1. First, make sure the construction site is flat, then measure the value, put the line and positioning piles on it, and roll the site on the pier side flat.
2. According to the designed drawings, calculate each pile and mark the position.
3. Prepare the drilling rig and fill the casing.
4. Check the hole position again.
5. Use a rotary drilling rig to drill the hole.
6. Inspect the hole after drilling.
7. Ensure that the hole meets the design standards.
8. Ensure that there are no problems with the location, diameter, depth and shape of the hole.
9. Prepare the steel cage for hoisting.
10. The steel cage is assembled and inspected in the factory and then transported to the construction site.
11. Lower the conduit.
12. Inject concrete.
13. Take protective measures near the hole.
Which is better, piling or digging foundation?
1. This depends on the house being built. If it is a high-rise building such as an office building or commercial housing, piling will be better because it is more stable and has stronger wind resistance. If it is based on the ground conditions, it is best to pile when building a building in a subsidence area, so as to avoid the sinking of the foundation.
2. There are many types of piling now, and their characteristics are also different. When we are carrying out house decoration construction, we must choose the appropriate piles according to our actual situation, and then construct, which can avoid a lot of trouble.